INTERVENTO |
DISCIPLINARE |
PROGETTO |
ESITO |
AFFIDO 1 - BASSA VIA 2016 COMPRENDENTE I LAVORI DI
SISTEMAZIONE SENTIERI “VERRAYES – NUS”, TAPPA 9 E “NUS –
ROISAN” TAPPA 10
|
|
|
|
AFFIDO 2 - BASSA VIA 2016 COMPRENDENTE L’INTERVENTO DI
RIPRISTINO MURATURE SUL SENTIERO COMUNALE “PLAN RU –
BARMA”– MURATURE A MONTE – VI LOTTO – GRESSAN
TAPPA 19
|
|
|
|
AFFIDO 3 - BASSA VIA 2016 COMPRENDENTE I LAVORI DI
RIPRISTINO MURATURE IN PIETRAME IN LOCALITA’ TURILLE – 1°
LOTTO – (JOVENCAN) - TAPPA 19
|
|
|
|
AFFIDO 4 - BASSA VIA 2016 COMPRENDENTE I LAVORI DI
SISTEMAZIONE SENTIERI “ROISAN - GIGNOD”– (ROISANGIGNOD),
TAPPA 11
|
|
|
|
AFFIDO 5 - BASSA VIA 2016 COMPRENDENTE I LAVORI DI
MANUTENZIONE SENTIERI SUL TRATTO “ARPUILLES – POINT
AVISOD - VETAN”– (AOSTA, SARRE, SAINT-PIERRE) - TAPPA 13
|
|
(INTEGRAZIONE)
|
|
AFFIDO 6- BASSA VIA 2016 COMPRENDENTE I LAVORI DI
MANUTENZIONE SENTIERI SUL TRATTO “CHARVENSOD –
BRISSOGNE - FENIS” (CHARVENSOD, POLLEIN, BRISSOGNE, SAINTMARCEL, FENIS) -
TAPPA 20
|
|
|
|
AFFIDO 7 - BASSA VIA 2016 COMPRENDENTE I LAVORI DI
MANUTENZIONE SUL TRATTO DI RETE ESCURSIONISTICA NELLE
LOCALITA’“LILLIANES – PLAN COUMARIAL” (LILLIANES) –TAPPA
2
|
|
|
|
AFFIDO 8 - BASSA VIA 2016 COMPRENDENTE I LAVORI DI
MANUTENZIONE SULLA RETE SENTIERISTICA (ARVIER, INTROD,
RHÊMES-SAINT-GEORGES E VILLENEUVE) – TAPPE 16, 17, 18
|
|
|
|
AFFIDO 9 - BASSA VIA 2016 COMPRENDENTE GLI INTERVENTI DI
MANUTENZIONE SULLA RETE SENTIERISTICA DELL’ITINERARIO
REGIONALE, TAPPA 5: CHÂTEAU DE VALLAISE – COL DE VERT NEL
COMUNE DI ARNAD
|
|
|
|
AFFIDO 10 - BASSA VIA 2016 COMPRENDENTE GLI INTERVENTI DI
MANUTENZIONE SULLA RETE SENTIERISTICA DELL’ITINERARIO
REGIONALE, TAPPA 14: SAINT-PIERRE (VÉTAN) – LA SALLE,
TAPPA 15: LA SALLE – AVISE, TAPPA 16: AVISE – ARVIER
(LEVEROGNE)
|
|
|
|